Greater Lansing Michigan

Map It

Because we want you to get out and around we offer lots of different mapping options.

Use the interacive map to the right to navigate the Greater Lansing area!

Download the Greater Lansing App to your Smartphone and enjoy a mobile mapping function that will not only tell you where you are, but what's nearby! Get the mobile app free today at http://m.lansing.org

 

Driving Directions 



To the Lansing Center

Coming from the NORTH:

127 South to 496 West. Take 496 West to Grand Avenue (Exit 7A). Turn right (north) on Grand Avenue. Take Grand Avenue approximately 5 blocks to the intersection of Grand Ave. and Michigan Avenue. Turn right (east) on Michigan Avenue

Coming from the EAST:

96 West to 127 North (Exit 106B). Take 127 North to 496 West. Take 496 West to Grand Avenue (Exit 7A). Turn right (north) on Grand Avenue. Take Grand Avenue approximately 5 blocks to the intersection of Grand Ave. and Michigan Avenue

Coming from the SOUTH:

127 North to 496 West. Take 496 West to Grand Avenue (Exit 7A). Turn right (north) on Grand Avenue. Take Grand Avenue approximately 5 blocks to the intersection of Grand Ave. and Michigan Avenue. Turn right (east) on Michigan Avenue

Coming from the WEST:
96 East to 496/Downtown Lansing (Exit 95). Take 496 East to Pine-Walnut Sts./Downtown Lansing (Exit 6). Take exit and go approximately 5 blocks to Grand Avenue. Turn left (north) on Grand Avenue. Take Grand Avenue approximately 5 blocks to the intersection of Grand Ave. and Michigan Avenue.

 

Local Construction Projects

 


MiDrive App Flyer Thumbnail

 

The Michigan Department of Transportation has launched their new app. You can download the app using the information in the flyer above or visit www.michigan.gov/drive for more information.

To see traffic and construction information for other projects, please take a look at the categories below.

City of Lansing Projects

Moores River Drive Regional Network Connector - Major road & non motorized pathway projects
Start Date: March 31, 2014
End Date: October 15, 2014
Traffic to the Lansing Country Club will be affected.

Holmes Road – between MLK & Cedar – water main, road construction & gas work to be done
Start Date: April 22, 2014
End Date: August 1, 2014

Pedestrian Trail Work– work between Waverly & Cavanaugh Road - River Trail construction
Start Date: May 1, 2014
End Date: December 1, 2014

Jolly Road – between Dunkel & Collins Road – road resurfacing
Start Date: May 19, 2014
End Date: June 20, 2014

Pennsylvania Ave (Mt. Hope to I-496) Resurfacing & Water main Construction
Start Date: June 15, 2014
End Date: August 1, 2014
Traffic will be detoured

Martin Luther King – resurfacing project between Oakland & Grand River/Queen
Start Date: July 15, 2014
End Date: August 15, 2014

Museum Drive - Central Interceptor Sycamore Lindberg Rehab – Manhole work & Sewer Project
Start Date: TBD
End Date: TBD
Museum Drive Downtown will have portions closed however, two way traffic will be maintained throughout construction

Ingham County Road Department Projects

Gale Road Bridge over Willow Creek (N. Onondaga Drain) – reconstruction
Bridge replacement. Onondaga Township. Construction is anticipated to begin in January, with the bridge being opened to traffic by early July. The project will consist of removal of the existing structure and roadway approaches, replacement of the bridge structure with a concrete arch culvert, and new asphalt roadway over the arch, along with roadside grading and ditching. The posted detour will be along Ferris Road, Onondaga Road, and Plains Road.

Noble Road Bridge over Doan Creek – reconstruction
Bridge replacement. Leroy Township. Construction is anticipated to begin in January, with the bridge being opened to traffic by early July. The project will consist of removal of the existing structure and roadway approaches, replacement of the bridge structure with a concrete arch culvert, and new asphalt roadway over the arch, along with roadside grading and ditching. The posted detour will be along Dietz Road, Holt Road, and Meech Road.

Van Atta Road Bridge over the Red Cedar River
Over the Red Cedar River - Bridge Replacement. Meridian Charter Township. The project generally consists of replacing the existing 60-foot long jack-archbridge that was constructed in 1935 with a 2 lane wide with a 100-foot long bridge that will straddle the existing bridge foundations. The structure will also feature a dedicated sidewalk on the west side of the bridge, per the township's non- motorized master plan, and a canoe launch along the shore of the Harris Nature Center. It is anticipated that reconstruction for this project will begin the week of February 10, 2014, pending nominal improvement to current weather conditions. For the duration of the project, the bridge will be closed to through traffic, however local residents will always be able to access their property from at least one direction. Traffic will be detoured along Jolly Road, Meridian Road, and Grand River Avenue (M-43). It is anticipated that the new bridge will open to traffic in late May.

City of East Lansing

Coolidge Road Construction (Lake Lansing to Abbey) - May 12 to June 13, 2014
May cause intermittent lane closures during the day and full roadway closures at night during the paving process. Motorists are encouraged to exercise caution and seek alternate routes if possible.

Hagadorn Road Construction (Burcham to Haslett) - Early June to August 1, 2014
May cause intermittent lane closures during the day and full roadway closures at night during the paving process. Motorists are encouraged to exercise caution and seek alternate routes if possible.

Harrison Road Construction (Red Cedar River to Michigan) - May 19 to May 23, 2014
Will cause intermittent lane closures during the day. Motorists are encouraged to exercise caution and seek alternate routes if possible.

Old Hickory Lane Construction (Burcham to Whitehills Drive) - Early June to August 15, 2014
May cause intermittent lane closures during the day and full roadway closures at night during the paving process. Motorists are encouraged to exercise caution and seek alternate routes if possible.

MAC Avenue Sidewalk Repairs and Ramp Installation (Grand River to Burcham) - May 21-August 15

Local Streets Projects - June 10 to August 15, 2014
Local street work will take place on Merritt Road, from Haslett Road to Park Lake Road; Ridgewood Drive, from Hagadorn Road to Timberlane Street; Woodside Drive, from Hagadorn Road to Ridgewood Drive; and Walnut Heights Drive, from Woodside Drive to Ridgewood Drive.

Michigan State University
Campus detour map

North Campus Construction -
West Circle Drive by Agriculture Hall – construction: May through July
West Circle Housing by MSU Union – construction & detours: mid July through Mid August
Butterfield Hall in Brody Complex – construction & road closures through end of May

Michigan Department of Transportation
For the most up to date information from MDOT on the go, download the new MiDrive app at www.michigan.gov/drive

I-96 Shoulder Closure -
Eastbound and westbound I-96 between Canal Road and Eaton Highway. Expect median shoulder closures for cable barrier installation.
From: 4/21/2014
To: 8/1/2014

US-127 Shoulder Closure -
Location: US-127 from the US-127/I-496 interchange to Alward Road. Expect intermittent daytime shoulder closures for ITS work.
From: 4/29/2014
To: 5/30/2014

US-127 Single Lane Closure -
Northbound and southbound US-127 under the Holt Road and Cedar Street overpass. Expect intermittent lane closures on southbound US-127 from 7 AM to 3 PM and on northbound US-127 from 9 AM to 6 PM.
From: 5/7/2014
To: 6/9/2014

Interactive Map 

 

Maps for Download


map-graphic

 

 

 

 

 

 
Regional Map


MSU Maps


http://maps.msu.edu/

 


Parking Maps


ParkingMeter
Downtown Lansing:

 

Lansing Center Parking

Downtown Parking (PDF)